HPD 08

HYDRAULIC POLYP GRAB

MODEL DESCRIPTION

Hydraulic polyp grab with open, half-closed or closed jaws. The basic model grab is delivered with a reliable hydraulic rotator, which is integrated into the upper part of the carrier.

The load rating of the excavator in all working directions using this implement is key in selecting the grab and carrier assembly.

STANDARD CONFIGURATION

  • with 360º hydraulic rotation (max. 200 bar);
  • HARDOX 400 tips;
  • the jaw design ensures the gripping of any shape (from bulk materials to large pieces);
  • special storage cases;
  • all connecting pins are made from a special high-strength alloy with surface hardening;
  • covers over hydraulic cylinder rods.

CUSTOM OPTIONS

  • fixed mount (not rotating) (150 kg lighter);
  • replaceable teeth made of a wear-resistant material;
  • option to mount on a swinging brake;
  • special covers to prevent mechanical damage;
  • delivery with universal carrier to mount to any machine.

JAW SHAPE

  • open (indicated by an additional “1” code);
  • half-closed (indicated by an additional “2” code);
  • closed (indicated by an additional “3” code);
  • např. HPD 08 – 1250.1 značí drapák s objemem 1250 litrů, v provedení otevřeném.
Recommended carrier rating 30.0 – 45.0 [t]
Maximum load capacity 10 [t]
Maximum density 3 [t/m3]
Maximum working pressure 320 [bar]
Grab model Volume Weight [kg] Number of jaws Dimensions [mm]
[dm3] OPEN HALF-CLOSED CLOSED A B C D E F
HPD 08 - 1250 1 250 3 080 3 280 3 480 5 2 900 2 150 2 000 3 200 115 70
HPD 08 - 1500 1 500 3 380 3 580 3 780 5 3 050 2 300 2 200 3 500 115 70
HPD 08 - 2000 2 000 3 880 4 070 4 280 5 3 200 2 450 2 400 3 800 115 70
Weights in the table are inclusive of the hydraulic rotator and connecting pin.

Make an inquiry

© Copyright 2024 DAVON s.r.o.
DAVON s.r.o. | Sumperska 1353 | 783 91 Unicov | Czech Republic
Products +420585004535 | Engineering production: +420585004543

We need to know some information

What material do you mine?*
What is the elevation at the site of installation?*
What are the temperatures at the site of installation?*
Is the site of installation considered an explosive environment?