HPD 07

HYDRAULIC POLYP GRAB

MODEL DESCRIPTION

Hydraulic polyp grab with open, half-closed or closed jaws. The basic model grab is delivered with a reliable hydraulic rotator, which is integrated into the upper part of the carrier.

The load rating of the excavator in all working directions using this implement is key in selecting the grab and carrier assembly.

STANDARD CONFIGURATION

  • with 360º hydraulic rotation (max. 200 bar);
  • HARDOX 400 tips;
  • the jaw design ensures the gripping of any shape (from bulk materials to large pieces);
  • special storage cases;
  • all connecting pins are made from a special high-strength alloy with surface hardening;
  • covers over hydraulic cylinder rods.

CUSTOM OPTIONS

  • fixed mount (not rotating) (100 kg lighter);
  • replaceable teeth made of a wear-resistant material;
  • option to mount on a swinging brake;
  • special covers to prevent mechanical damage;
  • delivery with universal carrier to mount to any machine.

JAW SHAPE

  • open (indicated by an additional “1” code);
  • half-closed (indicated by an additional “2” code);
  • closed (indicated by an additional “3” code);
  • e.g. HPD 07 – 600.1 indicates a 600 litre grab in open configuration.
Recommended carrier rating 22.0 – 35.0 [t]
Maximum load capacity 6,5 [t]
Maximum density 3.0 [t/m3]
Maximum working pressure 320 [bar]
Grab model Volume Weight [kg] Number of jaws Dimensions [mm]
[dm3] OPEN HALF-CLOSED CLOSED A B C D E F
HPD 07 - 400 400 1 440 1 510 1 540 5 2 130 1 700 1 420 2 360 115 70
HPD 07 - 500 500 1 490 1 555 1 596 5 2 180 1 730 1 470 2 450 115 70
HPD 07 - 600 600 1 536 1 569 1 642 5 2 223 1 763 1 546 2 537 115 70
HPD 07 - 800 800 1 667 1 725 1 765 5 2 430 1 850 1 730 2 630 115 70
HPD 07 - 1000 1 000 1 795 1 846 1 880 5 2 540 1 930 1 880 2 770 115 70
Weights in the table are inclusive of the hydraulic rotator and connecting pin.

Make an inquiry

© Copyright 2024 DAVON s.r.o.
DAVON s.r.o. | Sumperska 1353 | 783 91 Unicov | Czech Republic

We need to know some information

What material do you mine?*
What is the elevation at the site of installation?*
What are the temperatures at the site of installation?*
Is the site of installation considered an explosive environment?