HCD 18

HYDRAULIC CLAMSHELL GRAB

MODEL DESCRIPTION

The hydraulic clamshell grab with rectangular jaws has an integrated carrier. The basic model grab is delivered with a reliable hydraulic rotator, which is integrated into the upper part of the carrier.

The load rating of the excavator in all working directions using this implement is key in selecting the right grab and carrier assembly.

STANDARD CONFIGURATION

  • with 360º hydraulic rotation (max. 200 bar);
  • HARDOX 400 blades;
  • replaceable threaded teeth from the highest quality materials;
  • special storage cases;
  • all connecting pins are made from a special high-strength alloy with surface hardening;
  • covers over hydraulic cylinder rods.

CUSTOM OPTIONS

  • fixed mount (not rotating) (100 kg lighter);
  • jaw configuration without teeth, or using HARDOX 500 blades;
  • option to mount on a swinging brake;
  • mechanical ejector/scraper;
  • special covers to prevent mechanical damage;
  • delivery with universal carrier to mount to any machine.
Recommended carrier rating 4.0 – 12.0 [t]
Maximum load capacity 3.0 [t]
Maximum density 2,6 [t/m3]
Maximum working pressure 220 [bar]
Grab model Volume Weight Number of teeth Dimensions [mm]
[dm3] [kg] A B C D E F G
HCD 18 - 600 400 1 200 5 2 230 1 580 1 480 1 970 600 115 70
HCD 18 - 800 520 1 308 7 2 230 1 580 1 480 1 970 800 115 70
HCD 18 - 1000 660 1 386 9 2 230 1 580 1 480 1 970 1 000 115 70
HCD 18 - 1100 800 1 465 9 2 290 1 620 1 570 2 040 1 100 115 70
HCD 18 - 1250 1 100 1 628 0 2 290 1 620 1 574 2 038 1 250 115 70
HCD 18 - 1300U* 1 200 1 650 0 2 390 1 630 1 785 2 245 1 300 115 70
HCD 18 - 1400 1 300 1 681 0 2 390 1 630 1 785 2 245 1 300 115 70
Weights in the table are inclusive of the hydraulic rotator and connecting pin.
*Max. density 1.6 t/m3

Make an inquiry

© Copyright 2024 DAVON s.r.o.
DAVON s.r.o. | Sumperska 1353 | 783 91 Unicov | Czech Republic
Products +420585004535 | Engineering production: +420585004543

We need to know some information

What material do you mine?*
What is the elevation at the site of installation?*
What are the temperatures at the site of installation?*
Is the site of installation considered an explosive environment?